ABOUT

Malaysia 1000tpd Iron Ore Beneficiation Project

May 19, 2021

Project Overview: Africa provided a one-stop mining industry chain service (EPC+M) for this project. Initially, the client entrusted Africa to carry out detailed beneficiation tests for it. After experiments, researchers from Africa Mine concluded that only the iron element in the raw ore of the project has recovery value, which is a low-phosphorus and low-sulfur acid primary magnetite ore, and conducted in-depth research on the characteristics of the ore, providing an ideal Process flow.

After that, Afurika appointed mine design and technical personnel to inspect the project site to help the customer choose the correct site, repeatedly optimized the details of the design plan, and handed over the complete plant design plan within a short period of time. Furica's professional technical strength and service attitude were moved.

PROJECT

 

Please leave a message
and we'll get back to you.

x
Home Whatsapp Inquiry